Site assessment, sizing guidance and installation support for new or replacement DG Sets at commercial and industrial facilities.
Installing a new DG Set — or replacing an existing one — starts with understanding the facility's load, layout and any regulatory or space constraints. In Kanpur, Gargi Enterprises supports commercial and industrial customers through this process, from initial site assessment through to installation and commissioning support.
Once installed, a generator can move on to scheduled maintenance or a DG Set AMC to keep it running reliably.
Load, space and layout review before recommending a capacity.
Straightforward guidance on generator capacity for the facility.
On-site support during positioning and connection.
Initial start-up and load testing of the installed unit.
Control panel and wiring checks as part of commissioning.
A clear handover before the generator goes into service.
We review the site, load requirement and any constraints.
A generator capacity is recommended based on the assessment.
Positioning, connection and panel work are carried out.
The unit is tested under load before handover.
Tell us your facility's load requirement and we'll schedule a site assessment.